Preface – Yokogawa SC25V User Manual

Page 4

Advertising
background image

4

IM12B6J1-40E-E

1. PREFACE

1.1 Introduction
This instruction manual provides information
for the installation and use of the SC25V,
combined 12mm glass sensor; pH, Ref, LE
and Temperature. The SC25V is the best
choice for the majority of typical process-
and waste water applications. The sensor is
designed with titanium liquid earth, increased
electrolyte reservoir and large surface area PTFE
diaphragm combined with a long pathway inner
junction resulting in a longtime stability and
prolonged lifetime.

1.2 ATEX/IECEx compliance
The model SC25V is intended for use in
potentially explosive atmospheres. A number of
restrictions apply on the use of this sensor.
All varieties of SC25V are ATEX certified:
II1G Ex ia IIC T3...T6 Ga (see chapter 2.7).

EC-type Examination Certificate Number:
DEKRA 11ATEX0014 X

IECEx-type Examination Certificate Number:
IECEx DEK 11.0064x

Special conditions for safe use:
For ambient temperature see chapter 2.7.
Electrostatic charges on the enclosure and
cable shall be avoided.

1.3 Unpacking & Checking
Upon delivery, unpack the sensor carefully and
inspect it to ensure it was not damaged during
shipment. If damage is found, retain the original
packing materials (including outer box) and
immediately notify the carrier and the relevant
Yokogawa sales office. Make sure the Model
Code on the sensor is the same as on the
packing list. The Model Code and Serial Number
are found on the VP-connector of the sensor.
Check that option(s) that were ordered are also
included.

1.4 Warranty & Service
Yokogawa products and parts are guaranteed
free from defects in workmanship and materials
under normal use and service for a period of
twelve months from the date of shipment from
the manufacturer. Individual sales organizations
can deviate from the typical warranty period,
and the conditions of sales relating to the
original purchase order should be consulted.
Damage caused by wear and tear, inadequate
maintenance, corrosion, or by the effects of
chemical processes are excluded from this
warranty coverage. In the event of warranty
claim, the defective goods should be sent
(freight paid) to the Service Department of
the relevant sales Organization for repair or
replacement (at Yokogawa’s discretion).

The following information must be included in
the letter accompanying the returned goods:
• Model Code and Serial Number.
• Original Purchase Order and Date.
• Length of time in service and description of

the process.

• Description of the fault and circumstances of

the failure.

• Process/environmental conditions that may be

related to the failure of the sensor.

• Statement as to whether warranty or

nonwarranty service is requested.

• Complete shipping and billing instructions for

return of material, plus the name and phone
number of a contact person that can be
reached for further information.

Returned goods that have been in contact with
process fluids must be decontaminated
and disinfected prior to shipment. Goods
should carry a certificate to this effect, for the
health and safety of our employees. Material
Safety Data sheets must be included for all
components of the process to which the
sensors/fittings have been exposed.

Advertising