Sensor assembly in-service instructions—/b option, Model ph87 retraction sensor assembly – Yokogawa pH/ORP Retractable PH97 User Manual

Page 10

Advertising
background image

10

IM M1263JL-A

Sensor Assembly In-Service Instructions-/B Ball Valve Option

8

Sensor Assembly In-Service Instructions—/B Option

REFER TO PAGES 15 AND 16 OF THE
SENSOR ASSEMBLY AND ITEMIZED PART
LIST FOR ALL THESE COMPONENTS.

[Step A]. TO PLACE ASSEMBLY

INTO SERVICE OPEN BALL

VALVE COMPLETELY.

Caution: OPENING VALVE

SUBJECTS SENSOR ASSEMBLY

TO LINE PRESSURE. IF THE

SENSOR IS NOT RETRACTED

COMPLETLY AGAINST STOP,

OPENING THE VALVE COULD

RESULT IN THE SENSOR

SUDDENLY RETRACTING THE

REMAINING DISTANCE

CAUSING DAMAGE TO THE

SENSOR ASSEMBLY OR INJURY

TO THE SERVICE PERSON.

Model PH87 Retraction Sensor Assembly

PLEASE NOTE

REFER TO PAGES 16 AND 17 OF THE
SENSOR ASSEMBLY AND ITEMIzED
PART LIST FOR ALL THESE
COMPONENTS

[STEP A]. TO PLACE ASSEMBLY
INTO SERVICE OPEN BALL
VALVE COMPLETELY.
CAUTION: OPENING VALVE
SUBJECTS SENSOR ASSEMBLY
TO LINE PRESSURE. IF THE
SENSOR IS NOT RETRACTED
COMPLETLY AGAINST STOP,
OPENING THE VALVE COULD
RESULT IN THE SENSOR
SUDDENLY RETRACTING THE
REMAINING DISTANCE
CAUSING DAMAGE TO THE
SENSOR ASSEMBLY OR INJURY
TO THE SERVICE PERSON.

[STEP B]. INSERT STAGE #1
SUBASSEMBLY INTO PROCESS.

[STEP C]. SECURE SENSOR IN
PLACE BY TIGHTENING
LOCkING NUT AND
FERRULES OF GLAND FITTING,
ITEM NO.3.

DO NOT INSErT TIP OF
SENSOr BEyOND INSIDE
wALL OF PrOCESS PIPE
TO AVOID TOrQuE AND
POSSIBLE BrEAKAGE.

THE IN-SERVICE ASSEMBLY SHOULD
APPEAR AS SHOWN BELOW.

THE FINAL ASSEMBLY IS NOW
READY TO BE PLACED INTO
SERVICE, WITH PACkING GLAND
LOCkING NUT ENGAGED BUT NOT
TIGHTENED AND SENSOR IN THE
RETRACTED POSITION.

Advertising
This manual is related to the following products: