Vcx- 4, Empty waste tank, Page 11 – MAHLE RTI VCX-4 User Manual

Page 12

Advertising
background image

Page 11

Empty Waste Tank

1.

Turn all panel valves to the Home position.

2.

Connect shop air to VCX Shop Air Coupler.

3.

Close Cone Adapter Valve.

4.

Turn all panel valves to the Empty Waste Tank position shown in the illustration below. This
orientation can also be obtained by positioning the panel valves toward the red highlights closest to
each valve.

5.

Place the end of the clear hose into a bulk waste container and open the Cone Adapter Valve.

6.

Waste coolant will begin leaving the VCX from the Waste Coolant Tank through the clear hose. Be
cautious not to spill waste coolant onto the floor as the hose may “jump” when the Waste Coolant
Tank is nearing empty. Clean up any spills that may occur immediately.

7.

Once the Waste Coolant Tank is empty, close the Cone Adapter Valve and turn all valves to the
Home position.

New

Waste

3

New

New

1

2

Clear Hose

Bulk Waste Container

Cone Adapter

Valve

AFTER EVERY PROCEDURE

TURN ALL VALVES TO HOME

HOME

FILL NEW TANK

EMPTY NEW TANK

EMPTY WASTE TANK

EMPTY WASTE TANK

(PRESSURE)

TOP OFF

EMPTY NEW TANK

EMPTY RADIATOR

(VACUUM)

EMPTY RADIATOR

FILL NEW TANK

TOP OFF

EMPTY NEW TANK

FILL RADIATOR

FILL NEW TANK

HOME

TOP OFF

VACUUM GAUGE

HOME

ON

HOME

HOME

ON

HOME

ON

NEW 2

NEW 1

NEW 3

SELECT NEW COOLANT SOURCE

TURN ONE VALVE ON TO

VCX- 4

Advertising