Vcx- 4, Fill new tank through hose, Page 5 – MAHLE RTI VCX-4 User Manual

Page 6: New waste new 3 new 1

Advertising
background image

Page 5

New

Waste

New

3

New

1

Cone Adapter

50/50 Mix Water/Coolant

Clear Hose

Adapter Hose

2

AFTER EVERY PROCEDURE

TURN ALL VALVES TO HOME

HOME

FILL NEW TANK

EMPTY NEW TANK

EMPTY WASTE TANK

EMPTY WASTE TANK

(PRESSURE)

TOP OFF

EMPTY NEW TANK

EMPTY RADIATOR

(VACUUM)

EMPTY RADIATOR

FILL NEW TANK

TOP OFF

EMPTY NEW TANK

FILL RADIATOR

FILL NEW TANK

HOME

TOP OFF

VACUUM GAUGE

HOME

ON

HOME

HOME

ON

HOME

ON

NEW 2

NEW 1

NEW 3

SELECT NEW COOLANT SOURCE

TURN ONE VALVE ON TO

VCX- 4

Fill New Tank through Hose

1.

Turn all panel valves to the Home position.

2.

Connect shop air to VCX Shop Air Coupler.

3.

Turn the appropriate New Tank Valve to fill the corresponding tank. Note that New Tank 1
is used in the illustration shown below.

4.

Turn the other panel valves to the Fill New Tank position as shown in the illustration below.
This orientation can also be obtained by positioning the panel valves toward the green
highlights closest to each valve.

4.

Place the Cone Adapter, with the Adapter Hose attached, into the container of new
coolant. Open the Cone Adapter Valve to draw coolant into the New Coolant Tank.

5.

Raise the hose out of the container of new coolant when the desired fluid level is reached
in the New Coolant Tank.

6.

Close the Cone Adapter Valve.

7.

Turn all valves to the Home position when done.

Note: DO NOT OVERFILL.

Advertising