Vcx- 4, Fill new tank through hose, Page 5 – MAHLE RTI VCX-4 User Manual
Page 6: New waste new 3 new 1
Page 5
New
Waste
New
3
New
1
Cone Adapter
50/50 Mix Water/Coolant
Clear Hose
Adapter Hose
2
AFTER EVERY PROCEDURE
TURN ALL VALVES TO HOME
HOME
FILL NEW TANK
EMPTY NEW TANK
EMPTY WASTE TANK
EMPTY WASTE TANK
(PRESSURE)
TOP OFF
EMPTY NEW TANK
EMPTY RADIATOR
(VACUUM)
EMPTY RADIATOR
FILL NEW TANK
TOP OFF
EMPTY NEW TANK
FILL RADIATOR
FILL NEW TANK
HOME
TOP OFF
VACUUM GAUGE
HOME
ON
HOME
HOME
ON
HOME
ON
NEW 2
NEW 1
NEW 3
SELECT NEW COOLANT SOURCE
TURN ONE VALVE ON TO
VCX- 4
Fill New Tank through Hose
1.
Turn all panel valves to the Home position.
2.
Connect shop air to VCX Shop Air Coupler.
3.
Turn the appropriate New Tank Valve to fill the corresponding tank. Note that New Tank 1
is used in the illustration shown below.
4.
Turn the other panel valves to the Fill New Tank position as shown in the illustration below.
This orientation can also be obtained by positioning the panel valves toward the green
highlights closest to each valve.
4.
Place the Cone Adapter, with the Adapter Hose attached, into the container of new
coolant. Open the Cone Adapter Valve to draw coolant into the New Coolant Tank.
5.
Raise the hose out of the container of new coolant when the desired fluid level is reached
in the New Coolant Tank.
6.
Close the Cone Adapter Valve.
7.
Turn all valves to the Home position when done.
Note: DO NOT OVERFILL.