Stuart Turner PH 35 ES B User Manual

Page 19

Advertising
background image

- 19 -

Briefly reconnect the mains power supply to the pump – the ‘power on’ light should

illuminate if the pump has been correctly wired.

Isolate the mains electrical power supply from the pump.

Re fit the terminal box lid ensuring no cables are trapped.

Re fit the four terminal box lid retaining screws, tighten to 0.8 Nm.

Flow Switch Circuit Test

1. First confirm visually that the flow switch reed clamp have not been dislodged during

handling or installation. The clamp must be fully located within the flow switch body

groove as shown.

2. To carry out the following test you will need to obtain

a magnet, a typical fridge magnet is suitable.

3. Ensure the power supply is switched on.
4. Position the magnet directly in front of the reed

clamp as shown. If pump does not start, then

slowly move the magnet up and down to a

position that exceeds the extent of the reed

clamp. The pump should instantaneously start

at some point during this extent of movement.

If this does not happen, this indicates a possible

fault with the reed switch or the P.C.B which is

located within the terminal box. These should be

checked electrically. Consult Stuart Turner for further instructions.

ENVIRONMENT PROTECTION

Your appliance contains valuable materials which can be recovered or recycled.
At the end of the products’ useful life, please leave it at an appropriate local civic waste

collection point.

Fig. 15

Groove

Body

Reed
Clamp

Magnet

‘Power on’ light

Terminal box lid

Retaining screws x 4

Fig. 14 Wiring removed for clarity

Advertising
This manual is related to the following products: