Nexo RS User Manual

Page 40

Advertising
background image

Page 40/58

RAY

SUB

S IMPLEMENTATION

t

θ

t

θ

t

θ

GROUP OF 2 RS15S STEERING

GROUP OF 3 RS15S STEERING

GROUP OF 4 RS15S STEERING

“Steering” delays values for the pairs can easily be computed according to following formula:

τ = h*sin(θ)/C (metric)

τ is the value to be applied to the second pair

h is the height of tilted elements ( 0.91m for 2 RS15s, 1.365m for 3 RS15s, 1.82m for 4 RS15s)

C is the speed of sound ( = 343m/s )

8.3.2 Delay

values

implementation

• If the coverage is to be tilted down, then top group delay should be set at 0ms and delay should

progressively increase on lower groups.

• If the coverage is to be tilted up, then lower group delay should be set at 0ms and delay should

progressively increase on upper pairs.

• Delay value for first group is always 0ms.
• Delay value for second group is τ
• Delay values for subsequent groups are 2τ, 3τ etc…

Table below lists these values for typical angle values:

TILT ANGLE

10°

15°

20°

25°

30°

35°

40°

45°

DELAY

τ

(ms)

0.0 0.2 0.5 0.7 0.9 1.1 1.3 1.5 1.7 1.9

GROUP

2 RS15s

DISTANCE

(cm) 0.0 7.9 15.8 23.6 31.1 38.5 45.5 52.2 58.5 64.3

DELAY

τ

(ms)

0.0 0.3 0.7 1.0 1.4 1.7 2.0 2.3 2.6 2.8

GROUP

3 RS15s

DISTANCE

(cm) 0.0 11.9 23.7 35.3 46.7 57.7 68.3 78.3 87.7 96.5

DELAY

τ

(ms)

0.0 0.5 0.9 1.4 1.8 2.2 2.7 3.0 3.4 3.8

GROUP

4 RS15s

DISTANCE

(cm) 0.0 15.9 31.6 47.1 62.2 76.9 91.0 104.4 117.0 128.7

Advertising
This manual is related to the following products: