Installation general – Mammoth 7 to 24 Tons: High Efficiency, Superior IAQ Twin and Quad Circuit Horizontal and Vertical (M-Vintage) User Manual
Page 4
4
MAMM-WSHP-IOM-1MA (November 2011)
Installation
General
1. To prevent damage, this equipment should not be
operated for supplementary heating and cooling
during the construction period.
2. Inspect the unit for any specific tagging numbers
indicated by the factory per a request from the in-
stalling contractor.
3. Check the unit nameplate for the size and voltage
rating and confirm against the plans that the unit is
being installed in the correct location.
4. Verify the installation location with the piping, sheet
metal and electrical contractors prior to installation
5. Verify all clearances are available for the unit prior
to installation.
6. Note the location and routing of water piping, con-
densate drain piping, and electrical wiring. The lo-
cations of these items are clearly marked on sub-
mittal drawings.
7. Mammoth recommends the unit be covered during
construction to protect components from dust and
other harmful material. This is critical while spray-
ing fireproofing material on bar joists, sandblasting,
NOTE:
Check the unit name plate for correct voltage with the
plans before installing the equipment. Make sure all
electrical ground connections are made in accordance
with local code.
IMPORTANT:
Mammoth water source heat pumps should be in-
stalled only by qualified personnel, experienced in the
installation of this equipment and related systems.
Read these instructions carefully before unpacking,
installing and operating this unit