Brocade Universal Four Post Rack Kit Installation Procedure (Supporting VDX 6740T) User Manual

Page 14

Advertising
background image

14 of 20

Universal Four-Post Rack Kit Installation Procedure

53-1002944-01 Rev.B

Attaching the front brackets to the rear of the switch

NOTE

In this installation, the brackets are named as called out in the parts list even though the installation of the brackets
is reversed from the flush front installation. Complete the following steps to attach the front brackets to the rear of
the switch.

1. Position the right front bracket with the flat side against the right rear side of the switch, as shown in

Figure 8

.

2. Insert four 8-32 x 5/16-in. flathead screws through the vertically aligned holes in the bracket and then into the

holes on the side of the switch. Use the upper and lower screw holes, leaving the center holes empty.

3. Repeat

step 1

and

step 2

to attach the left rear bracket to the left side of the switch.

4. Tighten all the 8-32 x 5/16-in. screws to a torque of 15 in-lbs (17 cm-kgs).

FIGURE 8

Attaching the front bracket to the rear of the switch

1

Switch

2

Screws, 8-32 x 5/16-in., flathead Phillips

1

Brackets, front

Advertising