Site preparation

1

Brocade Mobility RFS7000 Controller Installation Guide

3

53-1001574-03

Site preparation

•

Consult your site survey and network analysis reports to determine specific
equipment placement, port capacity, power drops, and so on.

•

Assign installation responsibility to the appropriate personnel.

•

Identify where all installed components are located.

•

Verify appropriate rack mounting requirements.

•

Provide a sufficient number of power drops for your equipment.

•

Ensure adequate, dust-free ventilation to all installed equipment.

•

Identify and prepare Ethernet and console port connections.

•

Verify that cable lengths are within the maximum allowable distances for
optimal signal transmission.

•

Verify that the Mobility RFS7000 Controller is powered through an
Uninterruptible Power Supply (UPS).