Installation steps – Burcam 506732 CONVERTIBLE C.I. JET PUMP WITH FLUOMAC 3/4HP 115V User Manual
Page 3

FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029
3
APPLICATION
❏ This pump is designed for shallow well
installation for water level up to 80 feet.
❏ CAPACITY AT 30 PSI, express in US GPH
5’
600
10’
525
15’
450
20’
350
30’
550
40’
450
50’
350
80’
175
FEATURES
❏ Easy to prime cast iron or stainless steel
pump body
❏ Totally enclosed, fan cooled motor,
bearing to bearing. Built for a continuous use.
❏ Full time connected run capacitor, to eliminate
starting wear vs regular motor.
❏ Thermal and overload protection.
❏ Noryl impeller, built-in injector
❏ 115VAC, 60Hz
3/4HP, 115VAC, 60Hz, 9A, 19A (when start).
INSTALLATION STEPS
We recommend that you install your pump in a clean and dry location where there is
adequate room for servicing at a later date. Protection from freezing temperatures and good
ventilation should be considered as well, to provide the pump an environment for long life.
Locating the pump as close as possible to the water source will reduce friction losses
encountered in the suction pipe.
Friction losses in the suction pipe must be taken into consideration when the horizontal
offset is greater than 50 feet. The suction pipes should be increased from 1” to 1 1/4”. This
will reduce friction losses and allow the pump to give maximum performance.
A new well should be checked to determine that it is free from sand. Sand will damage the
seal and the impeller. Have your well driller clean the well before your installation.
Never run the pump dry. Damage to the seal may occur. Fill pump body and suction pipe
with water before turning on the power.
THE RUN OF HORIZONTAL PIPE FROM THE TOP OF
YOUR WELL INTO THE HOUSE, WHERE YOUR PUMP
WILL BE LOCATED, MUST BE INSTALLED IN A TRENCH,
BELOW THE FROST LEVEL OF YOUR AREA.
STEP 1
FRICTION LOSS IN
PIPE NOT INCLUDED