Installation steps, Step 1 step 2 step 3 step 4 – Burcam 400416T HEAVY DUTY GRINDER PUMP 3/4HP 115V User Manual

Page 3

Advertising
background image

FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029

3

APPLICATIONS

This domestic submersible sewage pump is

designed and suitable for raw sewage

applications where the total head requirements

do not exceed 25 feet, including pipe

friction losses.

CAPACITY:

400416T

5’ 4200 US GPH

10’ 3300 US GPH
15’ 2400 US GPH
20’ 1500 US GPH
25’

600 US GPH

FEATURES

Grinder designed impeller made from cast iron.

Rugged cast iron pump body.

Stainless steel motor body.

Stainless steel mechanical rotary type motor

seal.

2” NPT pump discharge.

Thermal and overload protection.

1/2HP, 115VAC, 60Hz, 8A, oil filled base.

INSTALLATION STEPS

see typical installation diagram in page 4

We recommend that you install your pump and basin in a clean location where there is
adequate room for servicing at a later date. Protection from freezing temperatures and good
ventilation should be considered as well, to provide the pump an environment for long life.

Assuming that you have a sump pit located in your basement floor... Your sump pit should be
constructed from concrete, brick, tile or more recently a sump basin made from plastic and/or
fiberglass. The minimum size of your sump pit must be 18” in diameter and no less than 25”
deep. When pit is ready, proceed to next step.

Friction losses in the discharge pipe must be taken into consideration when many elbows and
fittings are installed in the discharge line. Each elbows and fittings must be considered as 1
feet of head.

Never run the pump dry. Damage to the seal may occur.

THE RUN OF THE PIPE FROM THE CHECK VALVE TO THE
EXISTING WASTE OR DRAIN LINE MUST NEVER BE SLOOPING
DOWNWARD EXCEPT WHEN CONNECTING TO SAME.

For a new installation, install your sewage basin in the excavation you have provided in the
basement floor of your home. Connect the necessary piping from your shower trap, toilet,
etc., to the inlet of your sewage basin, with the proper pipe and fittings (see diagram).

Cut a length of 40” to 42” of 2” ABS/DWV pipe. Cement the 2” ABS/DWV male adaptor to 2”
slip to one end of this pipe.

With your drill, make a 1/4” hole in the adaptor previously glued. This hole will prevent any
air locking wich might occur.

STEP 1

STEP 2

STEP 3

STEP 4

FRICTION LOSS IN

PIPE NOT INCLUDED