Installation steps for vertical application, Step 1 – Burcam 300315W LAUNDRY TUB PUMP 1/3HP 115V User Manual

Page 3

Advertising
background image

FOR INFORMATION TEL: 514.337.4415 FAX: 514.337.4029

APPLICATIONS
R

This pump is designed for a permanent

installation to handle normal waste water
from domestic washing machines, bar sinks
located in basement play room,
and generally all waste water not containing
solids or materials which will clog the
impeller operation, where the waste or
drain line is above the level for gravity flow to
sewer or septic bed connections.

R

CAPACITY:

2’ 1400 US GPH
4’ 1200 US GPH 8’ 800 US GPH
6’ 1000 US GPH 10’ 500 US GPH

FEATURES

R

High performance noryl impeller.

R

Full time connected run capacitor, to eliminate

starting wear vs regular motor.

R

Thermal and overload protection.

R

Flat union, check valve included

R

1/3HP, 115VAC, 60Hz, 5.7A.

INSTALLATION STEPS FOR VERTICAL APPLICATION

see typical installation diagram in page 4

We recommend that you install your pump in a clean and dry location where there is
adequate room for servicing at a later date. Protection from freezing temperatures and good
ventilation should be considered as well, to provide the pump an environment for long life.
Locate the pump directly under the strainer of laundry tub or sink as per installation diagram
(see page 4).

Friction losses in the discharge pipe must be taken into consideration when many elbows and
fittings are installed in the discharge line. Each elbows and fittings must be considered as 1
feet of head.

Never run the pump dry. Damage to the seal may occur.

THE RUN OF THE PIPE FROM THE CHECK VALVE TO THE EXISTING

WASTE OR DRAIN LINE MUST NEVER BE SLOOPING DOWNWARD

EXCEPT WHEN CONNECTING TO SAME.

Using teflon tape, install the female portion of the union under the laundry tub to the threaded
male adaptor of the strainer and screw the male part of the union, into the female pump
intake. Then screw the union to hold the pump securely in place.

Using teflon tape, screw the check valve to the pump discharge and aligned towards the
planned discharge line.

From the check valve, run your length of discharge pipe, using elbows and fittings, in your
shortest possible run to the existing waste or drain line.

Test pump operation by filling laundry tub with water. Connect the 3 prong plug (never run
the pump dry) in a receptacle to activate the pump motor (Important notice: The electrical
outlet must be activated by a wall switch) Check all plumbing connections for leaks and
correct where necessary.

Unplug (turn off wall switch) to stop the motor.

STEP 1

FRICTION LOSS IN

PIPE NOT INCLUDED

STEP 2

STEP 3

STEP 4

STEP 5

STEP 6

3

Advertising