Davey CLEVALINK SYSTEM CONTROLS User Manual

Page 14

Advertising
background image

14

Installing an LCU:

1. When installing your LCU it is easier to program the network prior to mounting.

Simply plug in to any power outlet to activate the unit and begin programming.
Refer to the section titled “Operating the LCU”.

2. Mount the LCU in a location that is greater than 3.5 meters from the pool zone

and less than 1.5 meters from a power supply socket.


3. Plug the appliances to be controlled, into the outlets in the base of the LCU.

WARNING: The total current of the LCU must not exceed 10 Amp


4. Plugs the mains input lead into the power outlet 240V supply.

5. Switch on the power outlet and the 2 override switches on the LCU unit

(mechanical rocker switch above the outlets).

Operating the LCU:

Press

Selected

Display

Press and Hold outlet power

button, Red LED Will start to

flash, keep holding and go to

next step

.

Press and hold selected

remote button,

Signal LED will flash Green

when I.D. has been sent,

Function LED will flash when

I.D. has been received.

Release buttons.

Record the function of the

remote button on the label

supplied

Advertising