4. Installation

4.1 Hanging The Heater

Chain Suspension

Cable Suspension

Mount the heater with screw hooks and chains so that
the back of the heater is at least 12 inches (305 mm)
from the ceiling and wall. The heater must be a
minimum of 20 inches (500 mm) from floor, and
located so that livestock and combustible materials
are unable to come in contact with heater or within 10
ft (3 meters) of the hot air discharge.

If frequent height adjustment is required, use
cables and pulleys. Main line cable would be
connected to a winch.



4.2 Directions for Leveling

Adjust cables or chains as required
to level the heater. Use a
carpenter's level to check that the
heater is level.

4.3 Installing

Dual-Flare

Duct

Fold Dual-Flare duct to shape as
shown in Fig. 1. Install Dual-Flare
duct to heater exhaust (Fig. 1) as
shown with sheet metal screws
provided. This provides a multi-
directional heat flow that may be set
by bending flaps.

4.4 Connecting the Gas Supply

For gas connection (Fig. 2) attach
regulator to the Hi-Pressure Line (A)
at outside of building. Connect
flexible hose (B) to low pressure end
of regulator with special brass
coupling. See page 1 for LP, and
natural gas requirements.








































Fig. 2

A

B

High Pressure
Line

Gas Regulator

Flexible
hose

Fig. 2

Attach Flare
Duct To
Heater With
Sheet Metal
Screws

Adjust Flap To
Direct Heat Flow

Flare Duct

Fig. 1

Advertising