2 assembling the device, Setting up the railing – Seca 677 User Manual

Page 66

Advertising
background image

66 •

5.2

Assembling the device

Setting up the railing

1. Place the scale on a solid, level surface.

2. Release the latch for the railing.

3. Fold up the railing and hold it in this position.

4. Tighten up both locking screws until the railing is

firm without any play.

Latch

Locking screws

Advertising
This manual is related to the following products: