Section 2 - installation, 1 unpacking and inspection, 2 terminations and controls – KEPCO BHK-MG 40W (Half Rack) Series User Manual
Page 31: Unpacking and inspection -1, Terminations and controls -1
Advertising

BHK-1/2-MG SERIES 121313
2-1
SECTION 2 - INSTALLATION
2.1
UNPACKING AND INSPECTION
This instrument has been thoroughly inspected and tested prior to packing and is ready for
operation. After careful unpacking, inspect for shipping damage before attempting to operate.
Perform the preliminary operational check as outlined in PAR 2.5. If any indication of damage is
found, file an immediate claim with the responsible transport service.
2.2
TERMINATIONS AND CONTROLS
a). Front Panel: Refer to Figure 2-1 and Table 2-1.
b). Rear Panel: Refer to Figure 2-2 and Table 2-1.
FIGURE 2-1. BHK-MG SERIES, FRONT PANEL CONTROLS, INDICATORS AND CONNECTORS
Advertising