Page 6 BM 700 Installation and Operating Instructions

c) Purging device

Remove screw plug ¼" R and screw in
screwed tube joint, e.g. Ermeto ¼" R.

Consult “Ex“ specifications relating to the
purging circuit (provided by customer)!

Installation on the tank

•

Do not forget the gasket when
positioning the BM 700 on the tank
nozzle flange. Align BM 700 and gasket,
slightly tighten nuts on stud bolts (by
hand).

•

Press shielding strip C* in the gap
between tank and BM 700 flanges and
secure with strap retainer S* (both
items included with supply).

•

Strap retainer S* must fit closely and
overlap both flanges.

* only required for European radio approvals

•

Tighten down stud bolt nuts firmly. The
tightening torque is dependent upon the
strength properties of the stud bolts and
the pressure rating of the tank.




C* = shielding strip B = BM 700 flange
S* = strap retainer F = tank flange

Positioning on the tank

D

>1/7×H, but max. 1/3×D

H

Recommended distance Do not position in Do not position
from the tank wall tank centreline! above internals!
(multiple reflections!) (interference reflections!)

A Stilling well or Wave-Guide may be mounted in any position on the tank!

When using the PTFE Wave-Stick in hazardous areas of Zone 0, any electrostatic
charging of the stick, e.g. by flow of product, must be avoided!