Installation – KROHNE OPTIMASS 2400 User Manual
Page 19

INSTALLATION
3
19
OPTIMASS 2400
www.krohne.com
07/2014 - 4003533101- MA OPTIMASS 2400 R01 en
3.4.3 Side mounting
The meter can be installed with the converter (or remote junction box) on the side of the meter
so that the measuring tubes are sitting one above the other. Avoid this method of installation
where there is a two phase process flow, or where the process fluid contains gas. If this situation
cannot be avoided, please contact the manufacturer for advice.
3.4.4 Cross talk
Where more than one meter is being installed, a very high level of immunity to cross talk means
that the meters can be mounted within close proximity to each other. The meters can be
mounted either in series or parallel, as shown.
INFORMATION!
Where the meters are installed in series, it is strongly recommended that the process pipe
diameter remains constant. For more information, please contact the manufacturer.
MA_OPTIMASS_2400_en_140515_4003533101_R01.book Page 19 Thursday, July 31, 2014 5:08 PM