Red user error messages, Additional installation tips, Performance check – Badger Meter Remote Electronic Display (RED) User Manual

Page 4

Advertising
background image

RED USER ERROR MESSAGES

The display will indicate one of the following messages if an er-

ror is encountered during programming of a meter reading:

MESSAGE

DESCRIPTIONS

CHECK WIRING,

OPEN CIRCUIT

One or both wires are discon-

nected. Check wiring connec-

tions between RED and the

register

CHECK WIRING,

REVERSE POLAR-

ITY

The red and black wires ap-

pear to have been reversed.

Check for proper polarity of

connection.

CHECK WIRING,

SHORT CIRCUIT

The red and black wires ap-

pear to be shorted together

somewhere.

INTERNAL

(SOMETHING)

An internal error has oc-

curred. Contact the manu-

facturer.

An “E” (for “Error”) will display to the left of the meter reading if

tampering has occurred by either disconnecting or short-circuit-

ing the two wires between the RED and the meter register. This

“E” is displayed until the RED is reprogrammed.

ADDITIONAL INSTALLATION TIPS

• Never short yourself on wire. It is better to have a little excess

than to have to go back and rewire.

• If the RED is replacing an existing Read-o-Matic® display, do not

use the existing interface wiring. You will need to replace it with

new RTR wire (Belden 8451).

• If after wiring, unit does not operate, check for bare wires touch-

ing each other.

• When stapling wire, be careful not to pierce covering. This could

short out unit.

• When installing the unit on buildings having a stone or masonry

exterior, the use of masonry cleats and fasteners is required. After

determining register location, use a 3/16” carbide-tip masonry

bit and drill two register mounting holes. Insert masonry cleats

and attach register with round head screws.

PERFORMANCE CHECK

The RED installation should be checked for proper operation by

using one of the following methods:

NOTE: If meter is installed backwards, the RTR transmitter will

not send a signal to the RED remote register. To insure meter is

installed correctly, flow arrow on meter should point in direction

of water flow.

• Meter Test — Run an adequate amount of water through the

meter and observe that the RED register records correctly.

• Ohm Meter Test — Once the complete system is wired, it is

important to check for continuity using an ohm meter. Connect

the ohm meter across the RED terminals. An “open” should be

indicated. When operating the RTR the ohm meter should show

a momentary voltage deflection toward zero when the RTR

sends a signal.

THIS DEVICE COMPLIES WITH PART 15 OF FCC RULES. OPERA-

TION OF THIS DEVICE IS SUBJECT TO THE FOLLOWING TWO

CONDITIONS: (1) THIS DEVICE MAY NOT CAUSE HARMFUL INTER-

FERENCE. (2) THIS DEVICE MUST ACCEPT ANY INTERFERENCE

RECEIVED, INCLUDING INTERFERENCE THAT MAY CAUSE UNDE-

SIRED OPERATION.

Advertising