Important, Final view, 7 connecting the system – Ouellet OTR User Manual

Page 19

Advertising
background image

19

Final view

Self-levelling

cement

cement glue

floor

covering

4.7 Connecting the System

IMPORTANT!

The system must be connected by a master electrician.

Cold lead

- 240V/208V connection:

- 120V connection:

Line 1–Black

Line–Black

Line 2–Red

Neutral–White

Bare wire–ground

Bare wire–ground

Measure the cable’s electrical resistance and record the readings on line
5) Upon installing the thermostat of the measures’ table.

Advertising