3 floor markings, 4 power levels and measurement chart – Ouellet OWC-R User Manual

Page 13

Advertising
background image

13

4.3 Floor markings

1. Use empty spaces (during construction or renovation) and with a marker or spray, draw markings

on the selected rigid insulation, indicating fixed elements to be bypassed (drains, walls, obstacles, etc.).
These markings will help delineate the area to be covered while keeping OWC-R heating cables at a safe
distance from those fixed elements.

2. Allow for a buffer zone at the end of each area for excess cable, if need be.
3. Identify the starting point for the concrete heating cable and the space required for the installation of

the cold lead duct.

4. Identify the location of the temperature sensor and temperature control device.

4.4 Power levels and measurement chart

The master electrician in charge of installing and connecting the OWC-R concrete heating cable system
must fill the measurement chart at each stage of the installation process. The measurement chart is located
on the electrical panel label which is supplied in the box with the product. This chart must be supplied to
the client and placed near the electrical panel.

If the chart is not filled in properly, the warranty

will be cancelled.

Warranty conditions are specified in section 7.

WARNING!

Image 2

Image 3

Advertising