Eight-bay sff hot-plug drive cage option – HP ProLiant ML110 G7 Server User Manual
Page 35

Hardware options installation 35
10.
Slide the drive cage assembly fully into the server chassis and install the four screws.
11.
Install the drives ("
" on page
CAUTION:
To prevent improper cooling and thermal damage, do not operate the server unless
all bays are populated with either a component or a blank.
12.
Install the access panel (on page
13.
Lock the tower bezel.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Eight-bay SFF hot-plug drive cage option
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel ("
Unlock and open the tower bezel
" on page
4.
Remove the access panel (on page
5.
Remove all installed drives.
6.
Disconnect the drive cage cables.