Optical drive option – HP ProLiant ML110 G7 Server User Manual
Page 42
Advertising

Hardware options installation 42
14.
Install the battery/capacitor pack.
15.
Install the full-length expansion board retainer, if any full-length expansion boards were removed.
16.
Install the air baffle (on page
17.
Install the access panel (on page
18.
Lock the tower bezel.
19.
Connect each power cord to the server.
20.
Connect each power cord to the power source.
21.
Optical drive option
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel ("
Unlock and open the tower bezel
" on page
4.
Advertising