Dedicated ilo management port option – HP ProLiant ML110 G7 Server User Manual
Page 50

Hardware options installation 50
9.
Install the expansion board.
10.
Connect any required internal or external cables to the expansion board. See the documentation that
ships with the expansion board.
11.
If installing a full-length expansion board, install back the board retainer.
12.
Install the air baffle (on page
13.
Install the access panel (on page
14.
Lock the tower bezel.
15.
Connect each power cord to the server.
16.
Connect each power cord to the power source.
17.
Dedicated iLO management port option
NOTE:
Depending on model purchased, the server may look slightly different than shown.
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the tower bezel ("
Unlock and open the tower bezel
" on page
4.