HP Insight Management-Software User Manual
Page 88
Advertising

Figure 43 Move profile prevalidation table
VCEM performs five validation steps during the exportation process as displayed in
.
These five steps validate source and target resources associated with the export operation. These
steps also validate feature compatibility between the server profile and the target VC Domain
Group as well as certifying feature compatibility specific to network and fabric features.
describes the status for each prevalidation step.
88
Managing server profiles
Advertising
This manual is related to the following products: