Installing the led cable (ml150 g3), Connector location (ml150 g3) – HP ProLiant ML110 G2 Server User Manual

Page 27

Advertising
background image

Hardware options installation 27

Installing the LED cable (ML150 G3)

Connector location (ML150 G3)

Cabling an HP Smart Array E200 controller card (ML150 G3)

1.

Power down the server (on page

6

).

2.

Remove the access panel ("

Access panel

" on page

11

).

3.

Install the card.
For more information, see the documentation that ships with the option and see "Expansion board
options (on page

42

)."

4.

Connect the LED cable to the card and to the system board.

5.

Unfasten the cable tie.

Advertising