HP XP Racks User Manual

Page 22

Advertising
background image

The following are examples of when you can perform a CG pair-split based on status of the BC
pairs in the CG:

Example 1

The are six BC pairs in a CG. Two of the pairs are paired (“PAIR” status), two are in
“COPY(PD)/COPY” status, and two are in “PSUS” status. In this case, you can perform a CG
pair-split, and doing so changes the status of all of the pairs in the CG to “PSUS”.

Example 2

There are two BC pairs in a CG and one is paired (“PAIR” status) and the other is in the
process of being resynchronized (“COPY(RS)/COPY” status). In this case, you cannot perform
a CG pair-split.

Example 3

The are six BC pairs in a CG. Two of the pairs are paired (“PAIR” status), two are in the
process of Quick Split (“PSUS(SP)/PSUS” status), and two are in “PSUE” status. In this case,
the CG pair-split ends abnormally and the status of all of the pairs in the CG remains the
same.

22

Business Copy system requirements and planning

Advertising
This manual is related to the following products: