Install the pci riser cage – HP ProLiant DL360e Gen8 Server User Manual

Page 20

Advertising
background image

Operations 20

7.

Lift the PCI riser cage to unseat the riser boards.

Install the PCI riser cage

CAUTION:

To prevent damage to the server or expansion boards, power down the server, and

disconnect all power cords before removing or installing the PCI riser cage.

1.

Align the PCI riser boards with the corresponding connectors on the system board, and then press down
the PCI riser cage.

2.

Push down the release tabs, and then rotate them 180° clockwise.

3.

Install the access panel (on page

19

).

4.

Install the server into the rack ("

Installing the server into the rack

" on page

26

).

5.

Power up the server (on page

16

).

Advertising