Identifying the server shipping carton contents, Installing hardware options – HP ProLiant DL320 G3 Server User Manual

Page 33

Advertising
background image

Server setup

33

WARNING: To reduce the risk of personal injury or

equipment damage when unloading a rack:

At least two people are needed to safely unload the rack from
the pallet. An empty 42U rack can weigh as much as 115 kg
(253 lb), can stand more than 2.1 m (7 ft) tall, and may become
unstable when being moved on its casters.

Never stand in front of the rack when it is rolling down the ramp
from the pallet. Always handle the rack from both sides.

Identifying the server shipping carton contents

Unpack the server shipping carton and locate the materials and documentation
necessary for installing the server. All the rack mounting hardware necessary for
installing the server into the rack is included with the rack or the server.

The contents of the server shipping carton include:

• Server
• Printed setup documentation, Documentation CD, and software products
• Power cord
• Rack mounting hardware kit and documentation

In addition to these supplied items, you may need:

• Application software CDs or diskettes
• Options to be installed
• Phillips screwdriver

Installing hardware options

Install any hardware options before initializing the server. For options installation
information, refer to the option documentation. For server-specific information,
refer to "Hardware options installation (on page

37

)."