HP ProLiant ML350e Gen8 v2-Server User Manual
Page 61

Hardware options installation 61
o
For a redundant power supply
10.
Install the PCI air baffle ("
" on page
11.
Install the access panel (on page
12.
Return the server to an upright position.
13.
14.
Connect each power cord to the server.
15.
Connect each power cord to the power source.
16.
Installing the FBWC module and capacitor pack (B120i)
To install the component:
1.
Power down the server (on page
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Unlock the front bezel (on page
4.
Place the server on its side.
5.
Remove the access panel (on page
6.
If installed, remove the PCI air baffle (on page
7.
Remove any full-length PCI expansion cards installed in PCI slots 3, 4, 5 and 6 ("
" on page