HP ProLiant ML570 G4 Server User Manual
Page 61

Hardware options installation 61
d.
Repeat for the right plastic clip.
14.
Connect the power cable from the server to the tape drive.
15.
Connect one end of the data cable to the tape drive and thread the other end into the server through
the tape drive bay.
NOTE: The appropriate cables should ship in the individual option kits or with the device being installed.
IMPORTANT: Route the USB cable under the mid fan cage.
16.
Slide the tape drive into the bay until it is seated securely.
17.
Connect the power and data cables ("
18.
Install the system board.
19.
Install the memory cage.
20.
Install the memory boards ("
Removing and installing a memory board (hot-plug)
"
Removing and installing a memory board (non-hot-plug)
21.
Install any expansion boards ("
22.
Install the center wall.