Hardware options installation, Introduction, Hard drive option – HP ProLiant BL490c G7 Server-Blade User Manual
Page 20

Hardware options installation 20
Hardware options installation
Introduction
If more than one option is being installed, read the installation instructions for all the hardware options and
identify similar steps to streamline the installation process.
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before
beginning any installation procedure. Improper grounding can cause electrostatic discharge.
Hard drive option
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the
internal system components to cool before touching them.
To install the component:
1.
Power down the server blade (on page
2.
Remove the server blade (on page
3.
Remove the access panel (on page
4.
Connect the cables to the hard drive.