Population order, Installing a dimm, Hot-plug hard drive guidelines – HP ProLiant SL4545 G7 Server User Manual

Page 38

Advertising
background image

Hardware options installation 38

Population order

For memory configurations with a single processor or multiple processors, populate the DIMM slots

sequentially in alphabetical order (A through F).
After installing the DIMMs, use RBSU to configure Advanced ECC, online spare, or lockstep memory support.

Installing a DIMM

CAUTION:

To avoid damage to the hard drives, memory, and other system components, the air

baffle, drive blanks, and access panel must be installed when the server is powered up.

1.

Power down the node (on page

21

).

2.

Remove the node from the chassis ("

Remove a node from the chassis

" on page

21

).

3.

Remove the access panel (on page

22

).

4.

Remove the processor air baffle (on page

23

).

5.

Open the DIMM slot latches.

6.

Install the DIMM.

7.

Install the access panel (on page

23

).

8.

Install the node into the chassis ("

Installing a node into the chassis

" on page

27

).

9.

Power up the node ("

Powering up the system

" on page

21

).

To configure the memory mode, use RBSU ("

HP ROM-Based Setup Utility

" on page

48

).

Hot-plug hard drive guidelines

When adding hard drives to the node, observe the following general guidelines:

The system automatically sets all device numbers.

If only one hard drive is used, install it in the bay with the lowest bay number.

Drives should be the same capacity to provide the greatest storage space efficiency when drives are
grouped together into the same drive array.

Advertising