Powering up and configuring the server – HP ProLiant ML310 G2 Server User Manual

Page 35

Advertising
background image

Server Setup

35

3. Connect the power cord to the AC power source.

WARNING: To reduce the risk of electric shock or damage

to the equipment:

Do not disable the power cord grounding plug. The grounding
plug is an important safety feature.

Plug the power cord into a grounded (earthed) electrical outlet
that is easily accessible at all times.

Unplug the power cord from the power supply to disconnect
power to the equipment.

Do not route the power cord where it can be walked on or
pinched by items placed against it. Pay particular attention to
the plug, electrical outlet, and the point where the cord extends
from the server.

Powering Up and Configuring the Server

To power up the server, press the Power On/Standby button.

While the server boots, RBSU and the ORCA utility are automatically
configured to prepare the server for operating system installation. To configure
these utilities manually:

Press the F8 key when prompted during the array controller initialization to
configure the array controller using ORCA.

Press the F9 key when prompted during the boot process to change the server
settings, such as the settings for language and operating system, using RBSU.
The system is set up by default for the English language and a Microsoft®
Windows® 2000 installation.

For more information on the automatic configuration, refer to the ROM-Based
Setup Utility User Guide
located on the Documentation CD.

Advertising