Installation instructions, Install the top mounting rail onto the case, Install the side accordion panels – GE AEN10AQ User Manual

Page 10: Prepare the window, Attach the top mounting rail seal strip

Advertising
background image

Installation Instructions

10

INSTALL THE TOP MOUNTING RAIL

ONTO THE CASE

Attach the top mounting rail onto the top of the

case with 3 Type B screws.

5

Type B

screws

Top

mounting

rail

INSTALL THE

SIDE ACCORDION PANELS

Slide the left and right accordion panels into

the top and bottom mounting rails.
Attach the accordion panels to the case using 3

Type A screws on each side.

6

A

B

Type A

screws

Top mounting rail

Bottom mounting rail

Accordion

panel

PREPARE THE WINDOW

• Cut the window sash seal to the window

width and stick the adhesive side to the

bottom of the sash.

7

Window sash

seal

BACK

INSIDE

4

ATTACH THE TOP MOUNTING RAIL

SEAL STRIP

Remove the backing from the top mounting rail

seal strip and attach the seal strip to the bottom

of the top maounting rail, along the front edge.

Allow the seal strip to overlap 3/8” on each end.

Top mounting rail

Remove

backing

from seal

strip

3/8”

3/8”

3/8” overlap

3/8” overlap

Top mounting rail

Seal strip

FRONT VIEW

Advertising
This manual is related to the following products: