Installation preparation, Venting options – GE PVB94STSS User Manual

Page 9

Advertising
background image

9

Installation Preparation

VENTING OPTIONS

• The downdraft vent is shipped with the

discharge outlet pointing straight down

and can be changed to the left or right

side.

‡7KHEORZHURXWOHWLVVL]HGIRU[

and can be transitioned to 6" round.

‡2UGHU-;5%IRULQVWDOODWLRQRIWKH

EORZHUDQGPRWRUEHORZWKHÀRRU

Side-to-Side Adjustments:

The entire blower mounting plate can be
DGMXVWHGWRWKHOHIWRUULJKW7KLV

will help to align vent discharge to house

ductwork.

Discharge Direction

The blower assembly may be removed and turned
ƒIRUDOHIWRUULJKWVLGHGLVFKDUJH
• A left or right 90° direction adjustment should be

performed before dropping into the countertop

opening.

• Flatten the shipping box to use as a pad.
• Lay the vent on its back and onto the pad.

To change to a left or right discharge:

• Remove the 4 screws holding the blower and the

mounting plate assembly to the downdraft vent.

Retain screws.

• Remove blower assembly; turn it over to access the

4 nuts holding the blower to the mounting plate.

Remove the nuts.

Discharge Down

$V6XSSOLHG

Loosen Screws

to Adjust
WR

Left or Right

IMPORTANT:

Do not lift motor by the power cable.

• Turn the blower to the left or right discharge

direction and reinstall the 4 nuts.

• Reinstall blower and mounting plate with original

screws.













Discharge Down

$V6XSSOLHG

Discharge Left

Discharge Right

Advertising
This manual is related to the following products: