Installation instructions, Install the top mounting rail onto the case, Install the side accordion panels – GE AEN08LQ User Manual

Page 10: Prepare the window, Attach the top mounting rail seal strip, Remove the air conditioner from the case (cont.)

Advertising
background image

Installation Instructions

10

INSTALL THE TOP MOUNTING RAIL

ONTO THE CASE

Attach the top mounting rail onto the top of the

case with 3 Type B screws.

5

INSTALL THE

SIDE ACCORDION PANELS

Slide the left and right accordion panels into

the top and bottom mounting rails.
Attach the accordion panels to the case using

3 Type A screws on each side.

6

A

B

Type A

screws

Top mounting rail

Bottom mounting rail

Accordion

panel

BACK

PREPARE THE WINDOW

• Cut the window sash seal to the window

width and stick the adhesive side to the

bottom of the sash.

7

Window sash seal

INSIDE

4

ATTACH THE TOP MOUNTING RAIL

SEAL STRIP

Remove the backing from the top mounting rail

seal strip and attach the seal strip to the bottom

of the top mounting rail, along the front edge.

Type B

screws

Top

mounting

rail

REMOVE THE AIR CONDITIONER

FROM THE CASE (CONT.)

Slide the air conditioner from the case by

gripping the base pan handle and pulling

forward while bracing the case. Do not pull or

lift on the styrofoam discharge area

FRONT

Do not

pull or

lift in this

DUHD³

damage

to the

unit may

result

E

3

Top mounting rail

Remove

backing

from seal

strip

Top mounting rail

Seal strip

FRONT VIEW

Advertising