JELD-WEN JII001 Vinyl Windows with Integral Nailing Fin User Manual

Page 5

Advertising
background image

SECURE WINDOW

Areas such as Florida and the Texas TDI region have different
anchoring requirements based on product certification. For
information on specific products, visit www.floridabuilding.org
or www.tdi.texas.gov and follow the anchoring schedule given in
the drawings for the product instead of the anchoring schedule in
this document.

Note!

Fastener (anchor)

heads must be flush. Do
not dent nailing fin. Use
the table below to find the
correct product and fasten it
as directed.

Window

Window

Mull joint

Nailing

fin

#8 x 1 1/4" pan/washer head screw

4"

4"

4"

See

table

3"- 7"

Mull Example

INSTALLATION INSTRUCTIONS

for Vinyl Windows with Integral Nailing Fin (JII001)

5

INSTALL WINDOW

WARNING!

To avoid injury, use at least two people to install.

Adequately support the window until completely fastened.

1. Run a continuous 3/8"

bead of sealant around
the interior side of the nail
fin on the side jambs and
head. On the sill, leave at
least a 2" gap every 8"
where it will contact the
rough opening.

2. Place window onto the

shimming support and tilt
into the rough opening.
The window sill must rest
on and be fully supported
by the shimming support.

3. Fasten window through

the nailing fin between
3"- 7" from one upper
corner.

4. Shim at each interlock, or

in the center, and within
4"- 6" of each corner on
the side and head jambs.
Apply additional shims to
the side and head jambs
as necessary to ensure
window position within
the opening is plumb,
level, and square. Larger
windows usually need
additional shims. Shims can
be secured with sealant or
adhesive.

5. Inspect window for square,

level, and plumb. Test for
proper operation (remove
and reinstall if necessary).

Gap

Interlock

Center

Shim

Jamb

Rough

opening

1/4" Sealant

gap

Interior

PG20 up to PG35

Fasten window through the nailing fin holes
3" - 7" from the corners and 12" apart all the
way around the window.

PG35 up to PG50
Awning, Casement,
Fixed, Hung,
Slider, PD

Fasten window through the nailing fin holes
3" - 7" from the corners and 8" apart all the
way around the window.

PG50 or above
Awning, Casement,
Slider, PD

Fasten window through the nailing fin holes
3" - 7" from the corners and 8" apart all the
way around the window.

PG50 or above Fixed

Fasten window through each nailing fin hole
(every 4") on the jambs and 8" apart along
the head and sill.

PG50 or above Hung

Fasten window through the nailing fin
holes 3" - 7" from the corners. Then, install
fasteners 12" on center on the jambs, with
fasteners every 4" on both sides of the
Interlock. Install fasteners 8" apart along the
head and sill.

Mull Joints

The first 12" beyond mull joints, on both
sides, must be fastened through each nail
fin hole.

Continuous Head and
Sill PG35

The first 4" from center, on both sides, must
be fastened every 2"

Continuous Head and
Sill above PG35

The first 6" from center, on both sides, must
be fastened every 2"

5

3"- 7"

Advertising