Assembly instructions – Yetter 1300 Series Bulk Seed Handling Equipment User Manual

Page 15

Advertising
background image

15

ASSEMBLY INSTRUCTIONS

SEED TRAIN TROLLEY 1300-133 (CONT.)

Step 14.

Thread the 2515-712 L.H. threaded hose cuff onto the 1300-553 vinyl hose. Insert the hose

cuff into the top of the cyclone. Secure the vinyl hose to the steel flex hose using the 3) 2515-405 cable
ties.

Step 15.

Connect the 1300-163-cyclone cable to the 1300-558 5’ control cable extension and connect

the 5’ cable extension to the switch input plug of the silver module box on the power unit.

Advertising