Assembly instructions – Yetter 1300 Series Bulk Seed Handling Equipment User Manual
Page 7
Advertising
7
ASSEMBLY INSTRUCTIONS
1300-132 SEED TRAIN FRAME ASSEMBLY
Step 1.
Attach the 4) 1300-249 stands and 2) 1300-478 hose hooks to the 1300-225 frame. Fasten two
stands to the frame using ½” x 1 ½” bolts and lock nuts. Fasten the other two stands and hose hooks using
the ½” x 2” bolts and lock nuts. Do no fully tighten the bolts.
Step 2.
Attach the 2) 1300-229 leg brace to the 1300-249 stand bracket using 8) ½” x 2” x 3” u-bolts and
½” lock nuts.
Step 3.
Tighten all bolts in steps 1 and 2 to the proper torque ratings of 85 ft. lbs.
Advertising