Assembly instructions – Yetter 1300 Series Bulk Seed Handling Equipment User Manual

Page 16

Advertising
background image

16

ASSEMBLY INSTRUCTIONS

SEED TRAIN FRAME CONNECTION KIT 1300-131

When two or more frame assemblies are used together, the 1300-131-connection assembly must be used.


Step 1.

Set the frames front to back of each other and aligned.


Step 2.

Remove the ½” x 2” x 3” u-bolts from the back leg stands of the forward frame and front leg

stands of the rear frame. Save the locknuts, they will be used in a later assembly.


Advertising