Assembly instructions – Yetter 1300 Series Bulk Seed Handling Equipment User Manual
Page 16
Advertising
16
ASSEMBLY INSTRUCTIONS
SEED TRAIN FRAME CONNECTION KIT 1300-131
When two or more frame assemblies are used together, the 1300-131-connection assembly must be used.
Step 1.
Set the frames front to back of each other and aligned.
Step 2.
Remove the ½” x 2” x 3” u-bolts from the back leg stands of the forward frame and front leg
stands of the rear frame. Save the locknuts, they will be used in a later assembly.
Advertising