Dake Model E-V Series User Manual

Page 12

Advertising
background image

7/21/08

Manual V-16, V-24, VH-24, V-40 & VH-40

12 – Section I

HIGH SPEED ROLLER GUIDES

Applications and Advantages:

Friction and abrasive cutting, filing operations, aluminum and woodcutting.

These guides eliminate having to change inserts when changing to blades of different widths.

Requirements for Installation:

These roller guides must be installed using a new 1/2” blade width band for proper alignment.

The 1/2” band should be tracked within the approximate center line of the band wheels.

Note: Be certain band wheels are clean are free of any foreign material build up before

proceeding.

Tools / Hardware Required:

Drill - 7/16”

Drill and tap for ¼” 20 set screw

¼” 20 set screw 1/4 - 3/8” long

Upper Guide Installation:

1: Remove the existing guide holder assembly (part A)

via the 2 countersunk socket head cap screws located

on the backside of the moveable guide arm post. (Part

B) Store the original guide holder assembly for future

use. Remove the lower (red painted, part C) hold

down foot located at the bottom of the movable guide

arm post. (See graphic below)

2: With a 7/16” drill the bottom guide-mounting hole

out. Drill from the front of the guidepost, to a depth of

approx. 1”. The hole should be just deep enough to

stop short of breaking through the countersunk portion

of the hole.

3: Drill and tap a hole for a ¼” 20 set screw approx. ½ - ¾” back from the front edge of the guidepost.

This hole must be centered (intersect) with the 7/16” hole. As shown above.

Advertising