Dake Model E-V Series User Manual

Page 8

Advertising
background image

7/21/08

Manual V-16, V-24, VH-24, V-40 & VH-40

8 – Section I

FILLING THE SPEED REGULATOR

This is pre filled at the factory

These instructions are for future use

1. Turn the saw on.

2. Screw the hand wheel in.

3. Turn the saw off once hand wheel is in.

4. Remove the mounting screws (item 6).

5. Remove the plug from the cylinder (Item 3).

6. Turn screw out.

7. Add oil (Lightweight hydraulic oil) slowly while turning the wheel out.

8. When it is completely full, replace the plug (Item 3).

9. Re-mount the cylinder to the saw body.

10. Turn on the saw and adjust to the desired speed.

11. When saw is at maximum RPM, re-adjust the lock nuts on Item 8

MACHINE OPERATION

Prior to performing any cutting with the machine, it is recommended that the personal become

familiar with the various controls and accessories.

PRECAUTIONS

No loose clothing.

Eye protection should be worn.

All guards must be in position.

Table is secured in place and locked. Table load capacity should be noted and not exceeded.

Extra supports may be required for large or cumbersome components.

Irregular shapes and small objects should be secured by means of a clamp or suitable fixture.

Machine and surrounding should be kept free of tools, scrap and foreign objects.

Machine should be locked out before making any adjustments.

Care in uncoiling, and coiling and installation of blades should be observed. Gloves recommended.

Storage of blades in an area near the machine will allow operating personal, to use the proper

blade for each operation.

Machine is furnished with electrical door interlocks. These interlocks should periodically be checked

for proper operation.

Advertising