3 installatio n, 1 prelimina ry operations, 2 installatio n example – Videotec SM164B User Manual

Page 46

Advertising
background image

Page 6

MNVCSM84A_0408

3 Installatio n

The following procedures should be carried out before connecting to the power supply, unless indicated

otherwise.

Installation should only be carried out by skilled, authorised technicians. Incorrect connection of the

various peripherals may lead to isolation of the video switcher from the whole system.

3.1 Prelimina ry operations

3.1.1 Opening th e package

If the package has no obvious defect due to dropping or abnormal scrapes and scratches, check the materials it
contains with the list supplied in Section 1.1 Contents of the package.
The installer technician will be responsible for disposing of the packaging material by recycling or, in any case,
according to the current legislation in the country of use.

3.1.2 Checking th e markings

Before starting installation, check the identification plates to make sure the supplied material

corresponds with the required specifications, as described in Section 1.5 Identification data. Never, under any
circumstances, make any changes or connections that are not described in this manual: the use of inappropriate
devices may be very hazardous for the safety of people and the system itself.

3.2 Installatio n example

MATERIAL USED:

Video management:

Telemetry management:

2 monitors

1 Receiver DTRX3 with DTCOAX board

2 cameras

1 DTMRX1 receiver

1 video matrix SM164A

1 Pan&Tilt motor PTH910P

1 Pan&Tilt motor PTH910

Control keyboards:
1 DCTEL control keyboard PC

Alarm sensor

Advertising