3f 3e – LBL Lighting MILO SCH User Manual

Page 3

Advertising
background image

3

Feed the fixture wires through the mounting plate
center hole and then pull them out of the electrical box.
Note: If the cord has a cloth cover, peel back or remove
the cloth where the secondary strain relief is installed.

Install the secondary strain relief by first feeding the
power cord through it.

Snap the strain relief tab into place.

Pull the cord to take up the slack and fit the rest of the
cord in the strain relief’s openings.

TAB

3F

3E

9

10

11

12

13

14

9

11

10

12

12

15

16

Reconnect the power cord wires to their original
connections (reversal of 3C).

Connect the mounting plate and the fixture ground
wire to a suitable ground in accordance with local
electrical codes.

Connect the white ballast wire to the neutral power line
wire.

Connect the black ballast wire to the hot power line
wire.

BALLAST

15

14

14

13

13

16

Leave 6" of the cord behind the canopy for power
connections. Cut the excess cord.

From the end of the cord, strip the insulation 4" using a

sharp knife.

.

Make sure not to nick the inner wires

Strip the end of the wires.

8

7

6

4"

3D

Advertising