2e 2d – LBL Lighting Tindra P User Manual

Page 3

Advertising
background image

3

Feed the fixture wires through the mounting plate
center hole and then pull them out of the electrical box.
Note: If the cord has a cloth cover, peel back or remove
the cloth where the secondary strain relief is installed.

Install the secondary strain relief by first feeding the
power cord through it.

Snap the strain relief tab into place.

Pull the cord to take up the slack and fit the rest of the
cord in the strain relief’s openings.

TAB

2E

2D

8

9

10

11

8

10

9

11

11

Connect the mounting plate and the fixture ground wire
to a suitable ground in accordance with local electrical
codes.

Connect the insulated wire with the white tracer to the
neutral power line wire with a wire nut.

Connect the other insulated wire to the hot power line
wire with a wire nut.

12

13

14

13

14

12

Place the ballast, all wires, wire nut connections, and the
secondary strain relief properly inside the electrical box.

Loosen the set screw on the primary strain relief.

Align the canopy center hole with the mounting plate
center hole.

Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the

mounting plate.

Do not turn the cord.

Push the cord into the canopy and line up the marked
point on the cord with bottom of the primary strain
relief.

Tighten the plastic set screw to secure the cord.

STRAIN RELIEF

NOTE:

It is recommended that one person hold the

fixture while the electrician finishes the installation.

CORD

SET SCREW

2F

15

16

17

18

19

20

Advertising