2e 2d – LBL Lighting Alaya SP User Manual

Page 3

Advertising
background image

3

Adjust the fixture height by moving the clear cord and aircraft

cables up or down.

When the desired height is achieved, from inside mark the

clear cord right behind the threaded nipple for the strain relief

location.

MARKED
POINT

THREADED
NIPPLE

Feed the clear cord into the canopy so that the marked point

is exposed behind the canopy.

Loosen the strain relief screw

. Slide the

(Do Not Remove)

strain relief down the clear cord right above the marked point

and tighten the screw.

Slide the clear cord down so that the strain relief seats against

the threaded nipple.

For power connection, leave at least 6" of the clear cord

exposed behind the canopy.

Cut off the excess clear cord with a sharp cutter.

STRAIN RELIEF

MARKED POINT

THREADED
NIPPLE

To adjust the aircraft cables following steps 3 through 5 on

page 1.

Slide the conical caps up and screw them completely to the

cable grips.

Leave 6" of the aircraft cable exposed behind the canopy.Trim

off excess aircraft cable.

Back out

the slotted head screws on the

(Do Not Remove)

metal strain relieves and remove the cut out aircraft cables.

For each aircraft cable exposed behind the canopy, feed the

aircraft cable from one strain relief hole, then loop it and feed

it through the other hole.

Tighten the slotted head screws.

CONICAL
CAP

SLOTTED
HEAD SCREW

METAL
STRAIN
RELIEF

4"

From the end of the clear cord, strip the outer insulation 4"

using a sharp knife.

Make sure not to nick the inner wires.

Strip 1/4" of insulation from the inner insulated wires. The

bare inner wire is the ground wire.

2C

6

2E

2D

7

8

9

10

11

12

13

14

15

16

17

18

2F

19

20

19

9

11

8

18

18

15

14

14

15

17

16

6

7

Advertising