1e 1d 1f – LBL Lighting Perf SP User Manual

Page 2

Advertising
background image

2

Feed the cord into the canopy and plastic strain relief.

Adjust the fixture height and mark the cord below the canopy

bushing.

PLASTIC STRAIN RELIEF

CANOPY

CHORD

BUSHING

1"

Feed the cord inside the canopy so that the marked line is

exposed behind the canopy.

Hold the plastic strain relief 1" above the marked line and

tighten the set screw.

Slide the canopy up against the plastic strain relief and tighten

the M4 set screw snugly on the cap with 2 MM Allen wrench.

CAP

M4 SET
SCREW

2 MM ALLEN
WRENCH

MARKED LINE

PLASTIC STRAIN
RELIEF

4"

Leave 6" of the cord behind the canopy for power connections

and cut the excess cord.

From the end of the cord remove 4" of the cord insulation.

Strip 1/4" of the insulation from the wire ends.

1C

3

1E

1D

1F

6

5

7

4

9

8

10

3

4

6

5

7

9

10

Advertising