Install the cable post – LBL Lighting Mademoiselle S User Manual

Page 3

Advertising
background image

3

Place all wires and wire nut connections properly inside
the electrical box.

Loosen the set screw on the primary strain relief.

Align the canopy center hole with the crossbar center
hole.

Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the

crossbar.

Do not turn the cord.

Push the cord into the canopy and line up the marked
point on the cord with the bottom of the primary strain
relief.

Tighten the plastic set screw to secure the cord.

STRAIN RELIEF

CORD

SET SCREW

2C

6

7

8

9

10

11

Install the Cable Post

3A

7

1

Mark the cable post location point 24 5/16” away from the

center of the strain relief on the canopy.

STRAIN RELIEF

CAUTION:

Make sure to support the fixture while

installing, an assistant will be needed to complete
the remaining steps.

24 5/16”

CABLE POST LOCATION

Screw the anchor in the rest of the way with a Phillips

screwdriver.

3C

7

3

3

3B

7

2

Tap the anchor at the marked point up to the threaded portion

with a hammer.

ANCHOR

2

CEILING

Insert the #8 screw into the threaded nipple and washer.

Tighten the #8 screw completely into the anchor to secure the

washer and threaded nipple in place.

ANCHOR

WASHER

#8 SCREW

THREADED NIPPLE

3D

7

4