Install the cable post – LBL Lighting Constellation Grande SCF User Manual

Page 5

Advertising
background image

Install the Cable Post

ANCHOR

Tap the anchor at the marked point up to the threaded portion

with a hammer.

CEILING

4B

CAUTION:

Make sure to support the fixture while

installing, an assistant will be needed to complete
the remaining steps.

7

2

2

4A

10”

Mark the cable post location point 10” away from the center

cable clutch on the canopy. .

7

1

5

CABLE CLUTCH

CABLE POST LOCATION

Place all wires, wire nut connections, and the secondary
strain relief properly inside the electrical box.

Loosen the set screw on the primary strain relief.

Align the canopy center hole with the crossbar center
hole.

Slide the canopy up against the ceiling and secure it in
place by tightening the primary strain relief into the
crossbar. Do not turn the cord.

Push the cord into the canopy and line up the marked
point on the cord with bottom of the primary strain
relief.

Tighten the plastic set screw to secure the cord.

STRAIN RELIEF

CORD

SET SCREW

3C

10

11

12

13

14

15

CAUTION:

CONTINUE TO SUPPORT THE SHADE!

Do not let the fixture hang with out the completion
of the cable standoff installation (next section).

Advertising